Leederville Memorial Gardens
Cambridge Street, Perth, Western Australia, 6007
Operated by EO Charging
⚡ Station Details
Charger TypeAC
Power Rating11 kW
Stations2
Plugs1
🔌 Connectors
Type 21×
🔋 Charge Time & Cost Calculator
Estimate how long and how much it costs to charge your EV at this station
Charge Time
3h 16min
@ 11.0 kW
Estimated Cost
$12.60
36.0 kWh
Range Added
+295 km
20% → 80%
🏠 Charge at Home
Skip the queue — install a home EV charger and wake up to a full battery every day. Most AU homes can support a 7kW wall charger on a standard single-phase connection.
Affiliate links — we may earn a commission at no extra cost to you.
Nearby Charging Stations
1 The Avenue
1 The Avenue, Leederville, WA, 6014
AC 7kW439m
Water Corporation
629 Newcastle St, Perth, WA, 6007
AC 8kW588m
TEST location
203 hay street, perth, wa, 6008
DC 22kW955m
Stokes and Renk
299 Hay Street, Perth, Western Australia, 6008
AC 3kW1.1km
RAC, West Perth
832 Wellington Street, West Perth, WA, 6003
DC 350kW1.4km
Elder St - City of Perth Parking
Elder Street, Perth, WA, 6000
AC 22kW1.6km